Redevelopment at The Stone Company
As 2016 moves on so does the work to re develop our Chelmsford production plant. This reevelopment will give us more production capacity, this will be achieved by improving the flow of material through the factory.
Below are the new concrete bays that will house the bridge saws, the bay closest to the camera will house our new Terzago Bridge Saw. The floor is sloped back towards the wall, where there is a channel which collects the water and carries it to a recycling plant.
This is the new water treatment plant which cleans the water from the Bridge Saws and returns the water to the saws, this means that we don’t have to draw clean water from the mains supply.